Floor screed calculator

Count the dry mix for levelling a floor: self-levelling compound or classic sand-cement screed.

m
m
mm
kg
More settings
%
Dry mix202 kg

Shopping list

  • Bags9 bags of 25 kg

How we got there

Floor area
12 m²
Volume
0.12 m³
Consumption used
1.6 kg/m² per mm

Results are estimates. Always check the consumption printed on the product you buy.

How it is calculated

The amount depends on the floor area, the average thickness and the product consumption per square metre per millimetre. The calculator uses 1.6 kg for self-levelling compound and 2.0 kg for sand-cement screed. Measure the thickness at several points with a laser or water level and use the average.

FormulaDry mix, kg = area × thickness (mm) × consumption × (1 + reserve)Bags = dry mix ÷ bag weight, rounded up

Example

A 4 × 3 m floor levelled with a 10 mm layer of self-levelling compound needs about 202 kg with a 5 % reserve — 9 bags of 25 kg.

Tips from practice

  • Prime the base before pouring self-levelling compound, otherwise it loses water and cracks.
  • Most self-levelling compounds work from 3 to 30 mm. Thicker layers need a screed first.
  • Pour the whole room in one go; prepare enough bags and helpers.

Questions and answers

How much self-levelling compound per m²?

About 1.5–1.7 kg per square metre for each millimetre of thickness. For 10 mm that is about 16 kg per square metre.

What is the minimum screed thickness?

Sand-cement screed is usually at least 30–40 mm. Self-levelling compounds can be as thin as 3–5 mm.

How long before I can lay flooring?

It depends on the product and thickness: from a day for fast compounds to several weeks for thick sand-cement screed.

Found a mistake in a formula? Write to [email protected]